

On North Front Street,
known as
|
First
Views, April 2007
|
Floor
leveled out with concrete layer.
|
First
ideas about the ceiling, May 2007
|
Conception drawing for planning.
|
Second
side to stairway added
|
Air
cooling “Chiller” system is installed.
|
Curves
and post are plastered.
|
Rear
wall is now sheet rock.
|